✅ Selmo project preparation – Checklist before engineering start

This checklist helps to clarify all basic requirements, before starting the modeling and implementation of a project in Selmo Studio.

Objective:

  • clear technical prerequisites,

  • complete process definition,

  • secure scheduling,

  • avoidance of gaps in the model.


🔧 1. Project definition & goal

Acceptance criterion

Compliant?

Remark

Project goal clearly described

✅ / ❌

Function of the machine fully known

✅ / ❌

Responsible roles defined

✅ / ❌

CE and safety officers appointed

✅ / ❌


🧩 2. Process description (PFT)

Acceptance criterion

Compliant?

Remark

process: What should the machine do?

✅ / ❌

Function: Which actions are required?

✅ / ❌

technology: Which components are used?

✅ / ❌

PFT has been documented and coordinated with all parties involved

✅ / ❌


📐 3. Structural planning (Selmo basic structure)

Acceptance criterion

Compliant?

Remark

Plant (overall system) is clearly delimited

✅ / ❌

Planned HWZs with stations / modules defined

✅ / ❌

Per HWZ defined SEQs for each subprocess planned

✅ / ❌

Zones (signals) per SEQ roughly known

✅ / ❌

Zone types determinable (Input / Output / In-Out / Mem)

✅ / ❌


⚙️ 4. Technical prerequisites (Hardware / IO / Safety)

Acceptance criterion

Compliant?

Remark

PLC is IEC-61131-3 compatible

✅ / ❌

IO cards / safety modules specified

✅ / ❌

Sensors/actuators fully drawn into the plan

✅ / ❌

Safety functions designed (emergency stop, door etc.)

✅ / ❌

Signal naming system available (for zone assignment)

✅ / ❌


🔍 5. Requirements for safety & operation

Acceptance criterion

Compliant?

Remark

Operating modes: manual / automatic provided

✅ / ❌

Restart conditions defined

✅ / ❌

Operator guidance planned (HMI / buttons)

✅ / ❌

Safety functions CMZ/MXIC considered in the design

✅ / ❌

Operator logic (SEQ Control) taken into account

✅ / ❌


📄 6. Documentation and data base

Acceptance criterion

Compliant?

Remark

Signal directory in preparation

✅ / ❌

Parameter requirements roughly known

✅ / ❌

CE risk assessment started / available

✅ / ❌

Specification with PFT and process flow described

✅ / ❌

Project structure released for engineering start

✅ / ❌


📝 Conclusion

  • Check carried out on: _____________

  • Project designation: _____________

  • Preparation team: _____________

  • Status: 🔲 ready for implementation 🔲 incomplete 🔲 consultation required

Signature / approval: __________________________